Project cargo transportation is a type of logistics that provides private transportation of loads that cannot be done with standard logistics facilities. Since it is not possible to transport special construction equipment or infrastructure materials such as pipes and rails with containers, these products require a much more sensitive transportation.
When the project cargo is mentioned, heavy and bulky loads come first. Machinery used for construction is not only heavy but also sensitive. Rather than the equipment used in normal logistics transportation, much more sensitive and robust equipment is a part of the project transportation.
A customer- specific logistics strategy is developed for project and heavy cargo transportation. Especially in international transportation, time planning is of great importance. Timely and complete transmission is the first rule of project transportation. For this reason, companies engaged in project transportation ensure that the right equipment is used by issuing a large feasibility report before transportation. In addition, the selection of logistics equipment to be used is also a part of this report. In addition, all variables such as cost research, legal procedures, operational compliance are also calculated before the project transportation.





